Commissioning readiness
System readiness toward integrated testing
Illustrative commissioning records. Readiness percentages are demonstration values and are not a statement about any real system or any committed opening date.
Systems tracked
Scenario40
Blocked systems
Scenario19
Mean readiness
Scenario40%
Mean readiness by project
Illustrative average across the systems tracked for each project.
Commissioning register
Search by system or owner; filter by stage.
Scenario
| State | Owner | ||||
|---|---|---|---|---|---|
| Smoke controlCX-MAR-CASA-1Blocker: Open NCR-MAR-087 — dampers installed to superseded revision; re-test required before integrated test. | Mar Casa | design review | 1% | blocked | Commissioning Manager |
| Fire alarm and detectionCX-PARK-FIVE-2Blocker: Awaiting predecessor installation sign-off. | Park Five | design review | 1% | blocked | Project Manager |
| Fire alarm and detectionCX-ELEVE-2Blocker: Awaiting predecessor installation sign-off. | ELEVE | design review | 3% | blocked | Commissioning Manager |
| Electrical LV distributionCX-RIVAGE-4Blocker: Awaiting predecessor installation sign-off. | RIVAGE | design review | 3% | blocked | Project Manager |
| HVAC — central plantCX-MAR-CASA-3Blocker: Awaiting predecessor installation sign-off. | Mar Casa | design review | 4% | blocked | Commissioning Manager |
| BMS integrationCX-RIVAGE-5Blocker: Awaiting predecessor installation sign-off. | RIVAGE | design review | 6% | blocked | Commissioning Manager |
| BMS integrationCX-ELEVE-5Blocker: Awaiting predecessor installation sign-off. | ELEVE | design review | 8% | blocked | Project Manager |
| Vertical transportationCX-RIVAGE-6Blocker: Awaiting predecessor installation sign-off. | RIVAGE | design review | 9% | blocked | Project Manager |
| Fire alarm and detectionCX-MAR-CASA-2Blocker: Awaiting predecessor installation sign-off. | Mar Casa | design review | 12% | blocked | Project Manager |
| BMS integrationCX-MAR-CASA-5Blocker: Awaiting predecessor installation sign-off. | Mar Casa | design review | 12% | blocked | Commissioning Manager |
40 of 40 illustrative records match. Export includes all filtered records.